subject
Engineering, 02.10.2019 15:30 mandy9386

Which of the following best characterizes the relationship between a general contractor and a construction manager?

a construction manager works for a general contractor.
a general contractor is a person; a construction manager is usually a company.
a construction manager subcontracts a general contractor to perform work.
a general contractor is not involved in day-to-day operations; those are managed by a construction manager.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 19:10
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Which of the following best characterizes the relationship between a general contractor and a constr...
Questions
question
Mathematics, 22.02.2021 19:50
question
Social Studies, 22.02.2021 19:50
question
Mathematics, 22.02.2021 19:50
question
Advanced Placement (AP), 22.02.2021 19:50
question
Mathematics, 22.02.2021 19:50
question
Mathematics, 22.02.2021 19:50
question
Arts, 22.02.2021 19:50
question
History, 22.02.2021 19:50
Questions on the website: 13722361