Determine the optimal number of hours to use machines a and b to excavate and grade a cul-de-sac at minimum cost. solve using graphical method. given a construction site has machines that simultaneously excavate and grade machine a grades: ga = 18.9 unit h-1 and excavates: ea = 15.5 unit h-1 the cost to operate machine a is: ca = 101 $ h-1 machine b grades: gb = 10.2 unit h-1 and excavates: eb = 23.2 unit h-1 the cost to operate machine b is: cb = 1.10e2 $ h-1 each machine can be assigned to the cul-de-sac for no more than 10 hours. amount of grading: g = 100 unit amount of excavating: e = 150 unit "units" here are a measure of volume

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
You know the right answer?
Determine the optimal number of hours to use machines a and b to excavate and grade a cul-de-sac at...
Questions
question
Mathematics, 28.02.2020 07:00
Questions on the website: 13722361