Determine the optimal number of hours to use machines a and b to excavate and grade a cul-de-sac at minimum cost. solve using graphical method. a construction site has machines that simultaneously excavate and grade
machine a grades:
ga = 18.9 unit h-1
and excavates:
ea = 17.4 unit h-1
the cost to operate machine a is:
ca = 109 $ h-1
machine b grades:
gb = 8.41 unit h-1
and excavates:
eb = 23.9 unit h-1
the cost to operate machine b is:
cb = 109 $ h-1
each machine can be assigned to the cul-de-sac for no more than 10 hours.
amount of grading:
g = 100 unit
amount of excavating:
e = 150 unit
"units" here are a measure of volume.
what are the optimal number of hours to operate machine a? what are the optimal number of hours to operate machine b? what is the minimum cost to complete the excavation and grading?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Consider a large isothermal enclosure that is maintained at a uniform temperature of 2000 k. calculate the emissive power of the radiation that emerges from a small aperture on the enclosure surface. what is the wavelength ? , below which 10% of the emission is concentrated? what is the wavelength ? 2 above which 10% of the emission is concentrated? determine the wavelength at which maximum spectral emissive power occurs. what is the irradiation incident on a small object placed inside the enclosure?
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 19:10
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1
You know the right answer?
Determine the optimal number of hours to use machines a and b to excavate and grade a cul-de-sac at...
Questions
question
Chemistry, 20.04.2020 23:20
question
Mathematics, 20.04.2020 23:21
Questions on the website: 13722363