Athree-phase 80 kva transformer is rated to a primary voltage of 2.2 kv and a secondary voltage of 220 v. the transformer parameters are determined by open and short circuit tests. the results of the open and short circuit tests are: short-circuit test (low-voltage side short-circuited; data measured at high-voltage side): vsc = 48 v isc = 32 a psc = 800 w open-circuit test (high-voltage side open; data measured at low-voltage side) voc = 220 v ioc = 5.7 a poc = 220 w (a) determine the parameters of the equivalent circuit. draw the equivalent circuit of the transformer. (b) plot the voltage regulation and efficiency versus the load for both lagging and leading power factors of 0.6, 0.8 and 0.9. obtain the maximum efficiency values. assume the load voltage is equal to the rated secondary voltage of the transformer. (c) assuming the primary rated voltage is being supplied to the transformer, determine the load voltage when the transformer carries half load and the power factor is 0.8 both lagging and leading.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
Athree-phase 80 kva transformer is rated to a primary voltage of 2.2 kv and a secondary voltage of 2...
Questions
question
Mathematics, 19.04.2020 22:25
question
Chemistry, 19.04.2020 22:25
question
French, 19.04.2020 22:26
question
Mathematics, 19.04.2020 22:26
Questions on the website: 13722367