subject
Engineering, 10.10.2019 21:30 alyssa5485

(15 points): use the bode command in matlab to plot the bode plots of the following transfer functions. carefully observe how different terms modify the bode magnitude and phase plots. for each transfer function, include a brief (1-2 sentence) statement that describes how its bode plots compare with the bode plots of similar transfer functions in the list below. (a) l(s) = s(s +1)(s +5)/(s + 10) (s +2) (b) l(s) = s(s+1)(s+5)(s+ 10) , , )/(s + 2)(s + 6) (c) l(s) = s(s+1s +5)(s + 10)/(s + 2)(s + 4) (d) l(s) = s(s + 1)(s+5)(s + 10)

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
You know the right answer?
(15 points): use the bode command in matlab to plot the bode plots of the following transfer functi...
Questions
question
Mathematics, 27.03.2021 06:50
question
Physics, 27.03.2021 06:50
question
English, 27.03.2021 06:50
Questions on the website: 13722360