subject
Engineering, 19.10.2019 04:30 SkinnestXOXO

Production rate for an assembled product = 47.5 units per hour. total work content time = 32 minutes of direct manual labor. the line operates at 95% uptime. ten workstations have two workers on opposite sides of the line so that both sides of the product can be worked on simultaneously. the remaining stations have one worker. repositioning time lost by each worker is 0.2 min/cycle. it is known that the number of workers on the line is two more than the number required for perfect balance. determine (a) number of workers, (b) number of workstations, (c) balancing efficiency, and (d) average manning level.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
You know the right answer?
Production rate for an assembled product = 47.5 units per hour. total work content time = 32 minutes...
Questions
question
English, 20.05.2021 14:00
question
Physics, 20.05.2021 14:00
question
Mathematics, 20.05.2021 14:00
question
Biology, 20.05.2021 14:00
question
Social Studies, 20.05.2021 14:00
Questions on the website: 13722360