subject
Engineering, 22.10.2019 23:00 keiryporthillo

Uniform internal heat generation at q˙⁢ = 5.00 × 107 w/m3 is occurring in a cylindrical nuclear reactor fuel rod of 43-mm diameter, and under steady-state conditions the temperature distribution is of the form t(r)=a+br2 , where t is in degrees celsius and r is in meters, while a= 800 °c and b= -4.167 × 105 °c/m2. the fuel rod properties are k= 30 w/m·k, rho= 1100 kg/m3, and cp= 800 j/kg·k. what is the rate of heat transfer per unit length of the rod at r = 0 (the centerline) and at r = 25 mm (the surface)? if the reactor power level is suddenly increased to q2 = 108 w/m3, what is the initial time rate of temperature change at r = 0 and r = 25 mm?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 19:10
Afoot bridge is made as a simple deck, 4 m long, with a cross section 2 m (wide) and 20 cm thick, and made of wood. the deck is supported at the two ends. the maximum load allowable on the bridge is 10 tons, provided it is uniformly distributed on the deck. to sense this load, a strain gauge is placed at the center of the bridge and its resistance is monitored. if the sensor has a nominal resistance of 350 s2 and a gauge factor of 3.6, what is the reading of the strain gauge at maximum load? the modulus of elasticity for the wood used in the construction is 10 gpa.
Answers: 2
question
Engineering, 04.07.2019 19:10
Ahelical coil spring has a mean diameter of 50 mm, a wire diameter of 5.5 mm and is wound with a pitch of 10 mm. the spring steel has an ultimate strength of 1250 mpa. find the force needed to compress the spring solid and the wire stress in this condition. state whether the spring will return to its initial length.
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
Uniform internal heat generation at q˙⁢ = 5.00 × 107 w/m3 is occurring in a cylindrical nuclear reac...
Questions
question
Computers and Technology, 29.07.2019 14:00
Questions on the website: 13722367