subject
Engineering, 29.10.2019 04:31 Arealbot

An axis has a horizontal leadscrew that moves a 150 lb load. the screw has 5 threads per inch (p = 5 rev/in), ⇢ = 4.48 oz/in3 density, 42 in length, ⌘ = 0.75 eciency and 1.5 in diameter. the linear bearing friction coecient is µ = 0.15. the motion profile is trapezoidal with ta = td = 150 ms, tm = 1s, tdw = 0 s and vm = 2 in/s. all coupler inertias and carriage inertia are negligible. the servomotor has jm = 6.56 oz in2 inertia. calculate the peak and rms torques (in units of oz in) required for this application

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
An axis has a horizontal leadscrew that moves a 150 lb load. the screw has 5 threads per inch (p = 5...
Questions
question
English, 22.06.2019 03:30
question
English, 22.06.2019 03:30
question
Mathematics, 22.06.2019 03:30
question
Advanced Placement (AP), 22.06.2019 03:30
Questions on the website: 13722363