subject
Engineering, 29.10.2019 09:31 sarahsteelman

problem 1: schedule based on lot for lot and give the costs.
hedule
- in wet
2 weei
lead time =
setup cost =
holding cost=
stockout cost=
2 weeks
300 $
15 $ per week per unit
30 $/week
setup cost=
holding cost
stockout cost =
total=
1
10
16
2
15
7
3
20
4
25
5
10
6
200
8
25
9
15
period:
gross requirement
on hand begin of period
on hand end of period
net requirement
planned order receipt
planned order release
stockout

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
An ideal otto cycle with air as the working fluid has a compression ratio of 8. the minimum and maximum temperatures in the cycle are 300 k and 1340 k. use constant specific heats at room temperature to determine (a) the amount of heat transferred to the air during the heat- addition kj/kg, (b) the thermal efficiency, and (c) the thermal efficiency of a carnot cycle ope limits. process, in rating between the same temperature
Answers: 2
question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
question
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
You know the right answer?
problem 1: schedule based on lot for lot and give the costs.
hedule
- in wet
2 we...