subject
Engineering, 12.11.2019 21:31 breannaasmith1122

An emergency shoring for the construction of the bridge in between train traffic requires to have a temporary 20 feet column without bracing, and the vertical capacity is unknown. use a w14x74 (a992) section with both ends connected with pins. using the aisc-lrfd manual the properties are rx=6.04" and ry=2.48", whereas ag=21.8 in2 . what is the value of pu we can guarantee the railroad our column will resist? remember that they can’t afford to have a derailment or excessive movement with your solution.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
question
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
You know the right answer?
An emergency shoring for the construction of the bridge in between train traffic requires to have a...
Questions
Questions on the website: 13722362