Jobs arrive to a two-station serial line at a rate of five jobs per hour with deterministic inter-arrival times. station 1 has one machine, which requires exactly 20 minutes to process a job. station 2 has one machine which requires exactly 15 minutes to process a job, provided it is up, but is subject to failures where the mean time to failure is 9 hours and the mean time to repair is one hour. a) what is the total cycle time at workstation 2 (assume no move batching between two stations)? b) assume we have move batching between two stations. in other words, the second workstation receives batches and puts out individual parts. what is the total cycle time of the system with a batch size k-5? c) how can we improve this system (i. e. how can we reduce ct and wip or increase th)? d) suppose we have moderate variability in workstation 1,le·v-c3 +cf)/2-1. what is the total cycle time in the system with a batch size k=5? e) show that ct increases proportionally with batch size (provide a plot) f) how can we improve this system with moderate variability in workstation 1?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
You know the right answer?
Jobs arrive to a two-station serial line at a rate of five jobs per hour with deterministic inter-ar...
Questions
question
Biology, 22.09.2019 09:30
question
Mathematics, 22.09.2019 09:30
Questions on the website: 13722360