subject
Engineering, 18.11.2019 20:31 joelhtx

An individual hires a contractor to build a house, with the express order to use a specific type of electrical wiring. the contractor's crew, however, does not use the electrical wiring requested, but rather, another brand. the error is not discovered until after the house is almost complete, and it is too late for the contractor to replace the wiring without rebuilding the entire structure. the prospective homeowner does not want to pay, but a court rules that despite the mistake, the contractor has discharged the obligation under the contract. which type of discharge is present?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
question
Engineering, 04.07.2019 18:20
Prove the equivalence between the two statements of the 2nd law of thermodynamics (i.e., a violation of one statement leads to the violatio the other statement)
Answers: 2
question
Engineering, 04.07.2019 19:10
Agas is compressed from vi 0.3 m, p 1 bar to of v2 0.1 m3, p2--3 bar. pressure and volume are related linearly during the process. for the gas, find the work, in kj.
Answers: 2
You know the right answer?
An individual hires a contractor to build a house, with the express order to use a specific type of...
Questions
question
Mathematics, 29.01.2020 16:56
question
Mathematics, 29.01.2020 16:56
Questions on the website: 13722366