subject
Engineering, 19.11.2019 06:31 Jxsolvez

Two long rectangular settling basin are operating in parallel to treat 5 million gallons per day (mgd) of coagulated water. a length-to-width (l: w) ratio of 4: 1 and length to depth (l: d) ratio of 10: 1 will be used in design. overflow rate 1000 spd/ft a. determine the dimensions of the settling basin in feet. b. calculate the detention time of each basin in hours. c. determine the length of the efluent weir in each basin if the weir loading rate is not to exceed 12, gpd/ft. note: in your problem, replace 5 by 7.5.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Apump is used to circulate hot water in a home heating system. water enters the well-insulated pump operating at steady state at a rate of 0.42 gal/min. the inlet pressure and temperature are 14.7 lbf/in.2, and 180°f, respectively; at the exit the pressure is 60 lbf/in.2 the pump requires 1/15 hp of power input. water can be modeled as an incompressible substance with constant density of 60.58 lb/ft3 and constant specific heat of 1 btu/lb or. neglecting kinetic and potential energy effects, determine the temperature change, in °r, as the water flows through the pump.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
You know the right answer?
Two long rectangular settling basin are operating in parallel to treat 5 million gallons per day (mg...
Questions
question
Mathematics, 07.03.2021 20:20
question
English, 07.03.2021 20:20
question
Arts, 07.03.2021 20:30
question
English, 07.03.2021 20:30
question
Mathematics, 07.03.2021 20:30
Questions on the website: 13722361