Acertain job shop specializes in one-of-a-kind orders dealing with parts of medium-to-high complexity. a typical part is processed sequentially through 10 machines in batch sizes of one. the shop contains a total of eight conventional machine tools and operates 35 hours per week of production time. the machine tools are interchangeable in the sense that they can be set up for any operation required on any of the parts. average time values on the part are: machining time per machine = 0.5 hour, work handling time per machine = 0.3 hour, tool change time per machine = 0.2 hours, setup time per machine = 6 hours, and non-operation time per machine = 12 hours. a new programmable machine has been purchased by the shop that is capable of performing all ten operations in a single setup. the programming of the machine for this part will require 20 hours; however, the programming can be done offline, without tying up the machine. the setup time will be 10 hours. the total machining time will be reduced to 80% of its previous value due to advanced tool control algorithms; the work handling time will be the same as for one machine; and the total tool change time will be reduced by 50% because it will be accomplished automatically under program control. for the one machine, non-operation time is expected to be 12 hours.
explain how the variables used in the equations are found.
(a) determine the manufacturing lead time for the traditional method and for the new method.
(b) compute the plant capacity for the following alternatives: (i) a job shop containing the eight traditional machines and (ii) a job shop containing two of the new programmable machines. assume the typical jobs are represented by the data given above.
(c) determine the average level of work-in-process for the two alternatives in part (b), if the alternative shops operate at full capacity.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
question
Engineering, 04.07.2019 18:10
Awall of 0.5m thickness is to be constructed from a material which has average thermal conductivity of 1.4 w/mk. the wall is to be insulated with a material having an average thermal conductivity of 0.35 w/mk so that heat loss per square meter shall not exceed 1450 w. assume inner wall surface temperature of 1200°c and outer surface temperature of the insulation to be 15°c. calculate the thickness of insulation required.
Answers: 3
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
You know the right answer?
Acertain job shop specializes in one-of-a-kind orders dealing with parts of medium-to-high complexit...
Questions
question
Biology, 30.07.2019 07:30
Questions on the website: 13722363