Acast-iron pipe 2.0 ft in diameter and 200 ft long joins two water (60°f) reservoirs. the upper reservoir has a water-surface elevation of 155 ft , and the lower on has a water-surface elevation of 45 ft. the pipe exits from the side of the upper reservoir at an elevation of 120 ft and enters the lower reservoir at an elevation of 25 ft. there are two wide-open gate valves in the pipe.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 19:10
A)-in the process of engineering design, explain the contribution of material selection. b)- explain the procedure of synthesis as is employed in engineering design. c)- is there any relationship between ergonomics and engineering design? explain. d)- safety consideration in engineering design includes human, product and the enviroment . explain how safety will be incorporated into the design?
Answers: 3
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
Acast-iron pipe 2.0 ft in diameter and 200 ft long joins two water (60°f) reservoirs. the upper rese...
Questions
question
Mathematics, 04.11.2020 17:00
question
English, 04.11.2020 17:00
question
History, 04.11.2020 17:00
question
Mathematics, 04.11.2020 17:00
question
Mathematics, 04.11.2020 17:00
question
Mathematics, 04.11.2020 17:00
question
Mathematics, 04.11.2020 17:00
question
Physics, 04.11.2020 17:00
Questions on the website: 13722360