Engineering, 12.12.2019 01:31 nestergurl101

create a first draft of a wbs from the following scenario. make assumptions as needed based on the section about project planning considerations and constraints in this chapter. in your wbs, describe the skill sets required for the tasks you have planned.

sequential label and supply has a problem with employees surfing the web to access material the company deems inappropriate for a professional environment. therefore, sls wants to insert a filtering device in the company internet connection that blocks certain web locations and content. according to the vendor, the filter is a hardware appliance that costs $18,000 and requires 150 hours to install and configure. technical support for the filter costs 18 percent of the purchase price and includes a training allowance for the year. a software component that runs on the administrator’s desktop computer is needed to administer the filter; this component costs $550. a monthly subscription provides the list of sites to be blocked and costs $250 per month. an estimated four hours per week are required for administrative functions.

you should consider the following items:

• your plan requires two parts: one for deployment and another for ongoing operation after implementation.

• the vendor offers a contracting service for installation at $140 per hour.

• your change control process requires a 17-day lead time for change requests.

• the manufacturer has a 14-day order time and a seven-day delivery time for this device.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
create a first draft of a wbs from the following scenario. make assumptions as needed based on the s...
Questions
question
Mathematics, 04.12.2020 08:00
question
Mathematics, 04.12.2020 08:00
question
Mathematics, 04.12.2020 08:00
question
Mathematics, 04.12.2020 08:00
Questions on the website: 13722367