subject
Engineering, 13.12.2019 04:31 marley462847

Along and narrow rectangular plate carries a non uniform loading p = p0 sin (πy/b) and is clamped at edges y = 0 and y = b. (a) derive an expression for the deflection surface w. (b) determine the maximum deflection and maximum strain. (c) find the radius of curvature at y = b/3 by taking b = 0.6 m, t = 15 mm, e = 200 gpa, ν = 1/3, and pp0 = 50 kpa. (hint: =)) 2.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
question
Engineering, 04.07.2019 18:20
Air flows over a heated plate àt a velocity of 50m/s. the local skin factor coefficient at a point on a plate is 0.004. estimate the local heat transfer coefficient at this point.the following property data for air are given: density = 0.88kg/m3 , viscosity 2.286 x 10 ^-5 kgm/s , k = 0.035w/mk ,cp = 1.001kj/kgk. use colburn reynolds analogy.
Answers: 1
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Along and narrow rectangular plate carries a non uniform loading p = p0 sin (πy/b) and is clamped at...
Questions
question
Mathematics, 12.01.2021 03:00
question
Mathematics, 12.01.2021 03:00
question
Mathematics, 12.01.2021 03:00
question
Mathematics, 12.01.2021 03:00
question
Mathematics, 12.01.2021 03:00
question
Mathematics, 12.01.2021 03:00
Questions on the website: 13722361