subject
Engineering, 13.12.2019 18:31 cmucutie1

You are considering the purchase of a heat pump system with aresistive heating element in the air-handler for back-up during the extra cold winter months when the temperature is below the heat pump's capability. the manufacturer's technical data states the maximum current draw for the unit you are looking at is 18 amps at 240 volts, 1-phase. the circult breaker that you would have to install to carry this resistive load is:

a. 20 amp, 2-pole
b. 40 amp, 1-pole
c. 30 amp, 1-pole
d. 45 amp 2-pole
e. 25 amp. 2-pole

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 19:10
Apressure vessel with an r/t 20 cannot be treated as thin walled vessel. a)-trune b)- false
Answers: 3
You know the right answer?
You are considering the purchase of a heat pump system with aresistive heating element in the air-ha...
Questions
Questions on the website: 13722361