An incentive plan employing a kicker is in use. below standard performance the worker is guaranteed a rate of $6 per hour and above standard performance the worker is paid $9.20 per hour.

a job is studied and a rate of 0.036 hours per piece is set.

what is the direct labor cost per piece at the following efficiencies:
a. 50 percent?
b. 80 percent?
c. 98 percent?
d. 105 percent?
e. 150 percent?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
The thermal expansion or contraction of a given metal is a function of the f a)-density b)-initial temperature c)- temperature difference d)- linear coefficient of thermal expansion e)- final temperature f)- original length
Answers: 2
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
You know the right answer?
An incentive plan employing a kicker is in use. below standard performance the worker is guaranteed...
Questions
question
Social Studies, 05.11.2020 08:50
question
Mathematics, 05.11.2020 08:50
Questions on the website: 13722367