For laminar free convection flow on a vertical plate, the recommended values of c and n for use in the correla- tion of equation 9.24 are 0.59 and 1/4, respectively. derive the values of c from the similarity solution, equation 9.21, for pr-0.01,1, 10, and 100.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 06.07.2019 02:30
A12 mm diameter shaft runs in a plain cylindrical bush 30 mm long that is located in an 18 mm diameter hole in a housing. the shaft-inner bush fit is h8 f and the outer bush-housing fit is h7-p6. make a fully cimensioned sketch of the bush with tolerances. find the maximum and minimum clearance or interference for both fits on the inner and outer diameters of the bush
Answers: 3
question
Engineering, 06.07.2019 04:20
In modern manufacturing, which types of metal chips would be undesirable and why ? ?
Answers: 3
question
Engineering, 06.07.2019 04:30
At steady state, air enters an insulated duct of varying cross-sectional area (similar to a nozzle or diffuser) at 200 kpa, 52°c with a mass flow rate of 0.5 kg/s. at the duct exit, the pressure of the air is 100 kpa, the velocity is 255 m/s, and the cross-sectional area is 2 x 10-3 m^2. assuming an ideal gas model, determine: a)-find the specific volume of the air at the exit, in m3/kg. b)- the temperature of the air at the exit, in k. c)-the velocity of the air at the inlet, in m/s. d)-the inlet cross-sectional area, in m^2.
Answers: 1
question
Engineering, 06.07.2019 05:10
The ivanpah solar thermal power plant cost $2.2 billion to build. the gross plant electric output is 392 mw, and the net output is 377 mw. the planned capacity factor was 27.4%, but the actual capacity factor in 2016 was 20.5%. at best the plant thermal efficiency appears to be 18%. in addition, for the daily startup process, the solar plant also burned 1.3x10^12 btu of natural gas in 2016. the cost of natural gas in 2016 was about $2.5 per million btu. assuming a levelized annual fixed charge rate of 7%, determine (a) the capital cost (c/kwh) and (b) the fuel cost (e/k wh) for the electricity in 2016.
Answers: 3
You know the right answer?
For laminar free convection flow on a vertical plate, the recommended values of c and n for use in t...
Questions
question
Mathematics, 02.12.2020 17:50
question
Spanish, 02.12.2020 17:50
Questions on the website: 13722362