subject
Engineering, 20.12.2019 06:31 jasiyous21

A4000 m2 cultivated land (slope 1%) and a connected meadow (slope 5%) half the size of the cultivated land are to be developed. a residential lot will cover the area of cultivated land. the meadow will then be developed into a parking lot that will cover ¾ of the area and the remainder will be developed into streets. the cultivated land has soil type d while the meadow has soil type b, and there is no change in either soil type or slopes after development. use the baltimore idf curve.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:20
Aheavily insulated piston-cylinder device contains 0.02 m3 of steam at 300 kpa and 200 °c. 1.2 mpa. d this process. team is now compressed in a reversible manner to a pressure of etermine the entropy change and the work done on the steam during this process
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
A4000 m2 cultivated land (slope 1%) and a connected meadow (slope 5%) half the size of the cultivate...
Questions
question
Mathematics, 07.07.2019 04:20
question
Mathematics, 07.07.2019 04:20
question
Mathematics, 07.07.2019 04:20
question
Mathematics, 07.07.2019 04:20
question
Mathematics, 07.07.2019 04:20
Questions on the website: 13722367