The initial ultimate bod after mixing of the bergelmir river is 12.0 mg · l−1. the do in the bergelmir river after the wastewater and river have mixed is at saturation. the river temperature is 10◦ c. at 10◦ c, the deoxygenation rate constant (kd) is 0.30 day−1 , and the reaeration rate constant (kr) is 0.40 day−1 . determine the critical point (tc) and the critical do. tc = 2.88 days. critical do = 7.53 mg · l−1

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 19:10
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
The initial ultimate bod after mixing of the bergelmir river is 12.0 mg · l−1. the do in the bergelm...