The 1.2‐kg uniform slender bar rotates freely about a horizontal axis through o. the system is released from rest when it is in the horizontal position θ = 0, where the spring is unstretched. if the bar is observed to momentarily stop in the position θ = 50°, determine the spring constant k. for your computed value of k, what is the angular velocity of the bar when θ = 25°?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
The 1.2‐kg uniform slender bar rotates freely about a horizontal axis through o. the system is relea...
Questions
question
Health, 25.01.2021 23:40
question
Mathematics, 25.01.2021 23:40
question
Advanced Placement (AP), 25.01.2021 23:40
question
Mathematics, 25.01.2021 23:40
question
Mathematics, 25.01.2021 23:40
question
Chemistry, 25.01.2021 23:40
question
Mathematics, 25.01.2021 23:40
Questions on the website: 13722361