subject
Engineering, 23.01.2020 03:31 ConstanceBhoo301

Acoal-fired power plant equipped with a so2 scrubber is required to achieve an overall so2 removal efficiency of 85%. the existing scrubber is 95% efficient. rather than treating the entire gas stream to 95% removal, the plant proposes to treat part of the flue gas to 95% removal, and to bypass the remainder around the scrubber. calculate the fraction of the flue gas stream that can be bypassed around the scrubber (i. e., qbypass/q) and still satisfy the regulatory requirement.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
question
Engineering, 04.07.2019 18:20
Describe one experiment in which the glass transition temperature and melting temperature of a totally amorphous thermoplastic material can be determined. show the relevant experimental results in a diagram which should be properly annotated with the two temperatures clearly marked. what is likely to happen to the curve in the diagram if the amorphous polymer is replaced by a thermosetting type?
Answers: 2
question
Engineering, 04.07.2019 19:10
With increases in magnification, which of the following occur? a. the field of view decreases. b. the ambient illumination decreases. c. the larger parts can be measured. d. the eyepiece must be raised.
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Acoal-fired power plant equipped with a so2 scrubber is required to achieve an overall so2 removal e...
Questions
question
Mathematics, 07.01.2021 01:00
question
English, 07.01.2021 01:00
question
Mathematics, 07.01.2021 01:00
Questions on the website: 13722363