subject
Engineering, 29.01.2020 04:50 deeyoung92

Astudent would like to prepare a 0.010 m solution from a 1.0 m stock solution with minimal error.
the student can choose to do a one-step dilution that uses a 10-ml transfer pipet and a 1000-ml volumetric flask or a two-step dilution using a 50-ml pipet and a 1000-ml volumetric flask for the first dilution, and a 100-ml pipet and a 500-ml volumetric flask for the second dilution. which method has the smallest overall relative uncertainty and what is the value?
o two-step dilution: 0.0020
o one-step dilution; 0.0010
o two-step dilution; 0.0014
o one-step dilution; 0.0020

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
You know the right answer?
Astudent would like to prepare a 0.010 m solution from a 1.0 m stock solution with minimal error.
Questions
question
Mathematics, 05.05.2021 09:30
question
Mathematics, 05.05.2021 09:30
question
Mathematics, 05.05.2021 09:30
Questions on the website: 13722359