subject
Engineering, 11.02.2020 17:13 tylerwilliams1116

You are performing a risk assessment and prioritizing risks. You have estimated the cost of a loss caused by a certain attack. You estimated the potential frequency of the event over a period of time, and multiplied the cost times the frequency (the cost over that time period). Identify two reasons why the results may be misleading.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
You know the right answer?
You are performing a risk assessment and prioritizing risks. You have estimated the cost of a loss c...
Questions
question
History, 30.10.2019 13:31
question
English, 30.10.2019 13:31
question
Geography, 30.10.2019 13:31
question
Mathematics, 30.10.2019 13:31
question
Social Studies, 30.10.2019 13:31
Questions on the website: 13722367