subject
Engineering, 12.02.2020 01:23 luzperez2001

A mason requires 12 mason-hours per 100 ft2 for the bottom 4 ft of wall, and a hod carrier requires 14.5 helper hours to mix the mortar and carry mortar and brick to the masons. The masons lay the brick, square and tool the joints, and clean up at the end of the day. Wages for the mason and helper are $22.50 and $13.50 per hour. Find the cost per square foot.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Atmospheric air has a temperature (dry bulb) of 80° f and a wet bulb temperature of 60° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
question
Engineering, 04.07.2019 19:10
When subject to a steady load (within elastic range) over a long period of time, what is the major difference in material behavoir between steel and plastic?
Answers: 2
question
Engineering, 04.07.2019 19:20
A5 kg block of fe is dropped into a very large vat of water. the fe and water initial temperatures are 95 and 25 c, respectively. the fe final temperature is 25 c and the water can be treated as a thermal reservoir,. treated as a thermal reservoir take the water to be the system and determine the entropy generation. report vour answer in kj/k.
Answers: 1
question
Engineering, 05.07.2019 23:20
Which one of the following faults cause the coffee in a brewer to keep boiling after the brewing cycle is finished? a. an open circuit in the heating element b. a short circuit at the terminals c. welded contacts on the thermostat d. a leak around the gasket
Answers: 3
You know the right answer?
A mason requires 12 mason-hours per 100 ft2 for the bottom 4 ft of wall, and a hod carrier requires...
Questions
question
English, 29.06.2019 20:30
question
Biology, 29.06.2019 20:30
question
Mathematics, 29.06.2019 20:30
Questions on the website: 13722362