subject
Engineering, 20.02.2020 22:40 juana18

Strawberries contain 15 wt% fruit solids and 85 wt% water. To make strawberry jam, strawberries are fed to a crusher and the crushed strawberries are fed to a mixer and mixed with sugar in a 40:60 crushed strawberry stream:sugar ratio, and then the mixture is fed to an evaporator where water is evaporated until the jam product coming from it is only 1/4 water by mass. a. Draw a process flow diagram for this process and label your streams. b. Calculate what the flow of strawberries must be to the process to produce 2000 lbs of strawberry jam per hour and also what the mass flow rate of steam will be from the evaporator at this rate of production, c.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 04.07.2019 19:10
What is the chief metrological difference between measuring with a microscope and with an electronic comparator? a. the microscope is limited to small workpieces.a. the microscope is limited to small workpieces. c. the comparator can only examine one point on the workpiece. d. the microscope carries its own standard.
Answers: 1
You know the right answer?
Strawberries contain 15 wt% fruit solids and 85 wt% water. To make strawberry jam, strawberries are...
Questions
question
Mathematics, 28.08.2020 03:01
question
Mathematics, 28.08.2020 03:01
Questions on the website: 13722367