subject
Engineering, 25.02.2020 02:54 coolgirl10020031

An overpass is being built over the PVI of an existing equal-tangent sag curve. The sag curve has a 70 mi/h design speed and G1=-5%, G2=+3%. Determine the minimum necessary clearance height of the overpass and the resultant elevation of the bottom of the overpass over the PVI. Ignore the cross-sectional width of the overpass.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i.d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
question
Engineering, 04.07.2019 19:10
What are the major differences between injection molding and extrusion?
Answers: 2
You know the right answer?
An overpass is being built over the PVI of an existing equal-tangent sag curve. The sag curve has a...
Questions
question
Mathematics, 24.06.2019 04:30
question
Biology, 24.06.2019 04:30
question
Mathematics, 24.06.2019 04:30
Questions on the website: 13722363