Engineering, 25.02.2020 21:25 ggg509

Estimate the production (in CCY/hr) of a self-propelled tamping foot roller under the following conditions:

Average speed: 5 mph
Compacted lift thickness: 8 inches
Effective roller width: 10 ft.
Number of passes: 9
Job efficiency: 0.85

How many hours will it take for two rollers to compact 6,000 CCY?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
You know the right answer?
Estimate the production (in CCY/hr) of a self-propelled tamping foot roller under the following cond...
Questions
question
Social Studies, 24.09.2020 19:01
question
Computers and Technology, 24.09.2020 19:01
Questions on the website: 13722361