subject
Engineering, 28.02.2020 01:29 breannaasmith1122

Suppose you want to send N 100-byte messages over 8 hops. In order to find the minimum message transmission time, you may need to break up each message into M number of packets. Each packet requires a 5-byte header. Assume it takes 1 ns to transmit 1 byte of data. Using your favorite programming language, write a program to calculate the transmission time for message size M = 1 to 50 packets(a) The packets in a message must end at a byte boundary.(b) For example, if M = 3, then the message will be split into two 33-byte packets and one 34-byte packet. It cannot have three 33 1/3 byte packets. Tabulate message size (# pkts) and transmission time (ns). Plot transmission time vs message size (# pkts) What is the minimum transmission time? What is the associated value of M?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Refrigerant-134a enters the compressor of a refrigerator as superheated vapor at 0.14 mpa and -10°c at a rate of 0.05 ka/s and leaves at 0.8 mpa and 50°c. the refrigerant is cooied in the condenser to 0.72 mpa and 26'c. it is then throttled to 0.15 mpa. sketch the t-s diagram for the system and evaluate: 6) the rate of heat removai from the refrigerated space (kw), it) the power input to the compressor (kw), ii) the isentropic efficiency of the compressor (%), and iv) the cop of the refrigerator.
Answers: 2
question
Engineering, 04.07.2019 19:10
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 04.07.2019 19:20
At steady state, air at 200 kpa, 325 k, and mass flow rate of 0.5 kg/s enters an insulated duct having differing inlet and exit cross-sectional areas. the inlet cross-sectional area is 6 cm2. at the duct exit, the pressure of the air is 100 kpa and the velocity is 250 m/s. neglecting potential energy effects and modeling air as an 1.008 kj/kg k, determine ideal gas with constant cp = (a) the velocity of the air at the inlet, in m/s. (b) the temperature of the air at the exit, in k. (c) the exit cross-sectional area, in cm2
Answers: 2
You know the right answer?
Suppose you want to send N 100-byte messages over 8 hops. In order to find the minimum message trans...
Questions
question
Mathematics, 22.05.2020 09:57
question
Mathematics, 22.05.2020 09:57
Questions on the website: 13722362