Consider a 20 * 105 m3 lake fed by a polluted stream having a flow rate of 4.2 m3/s and pollutant concentration equal to 25 mg/L and fed by a sewage outfall that discharges 0.5 m3/s of wastewater having a pollutant concentration of 275 mg/L. The stream and sewage wastes have a second order decay rate of 0.32 L/(mg-day). Assuming the pollutant is completely mixed in the lake and assuming no evaporation or other water losses or gains, find the steady-state pollutant concentration in the lake. Derive the equation from the mass balance on C in the lake for full credit. Note that the quadratic equation will be useful for solving this problem.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
You know the right answer?
Consider a 20 * 105 m3 lake fed by a polluted stream having a flow rate of 4.2 m3/s and pollutant co...
Questions
question
Mathematics, 20.02.2020 03:57
question
Mathematics, 20.02.2020 03:57
Questions on the website: 13722362