subject
Engineering, 04.03.2020 23:40 destinywyatt9129

21. A gas tungsten arc-welding operation is performed on low-carbon steel. The unit melting energy for low-carbon steel can be determined by the methods of the previous chapter. Voltage = 20 V, current = 150 A, heat transfer factor = 0.55, and melting factor = 0.60. Filler metal wire of 4.0-mm diameter is added to the operation, so that the final weld bead consists of 60% filler and 40% base metal. If the travel speed in the operation is 5 mm/sec, determine (a) cross sectional area of the weld bead and (b) feed rate (mm/sec) at which the filler wire must be supplied.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
You know the right answer?
21. A gas tungsten arc-welding operation is performed on low-carbon steel. The unit melting energy f...
Questions
Questions on the website: 13722360