subject
Engineering, 06.03.2020 19:24 Pookiev

Suppose, that the EstimatedRTT is 90 at some point and the DevRTT is 25. After this point and on, all subsequent measured RTTs are 200. What is the TimeoutInterval after 10 RTT measurements? Use a=0.1 and b=0.25. You can use a spreadsheet or write a small program to perform the calculations. In that case attach either the spreadsheet or the code

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Two flowing streams of argon gas are adiabatically mixed to form a single flow/stream. one stream is 1.5 kg/s at 400 kpa and 200 c while the second stream is 2kg/s at 500 kpa and 100 ? . it is stated that the exit state of the mixed single flow of argon gas is 150 c and 300 kpa. assuming there is no work output or input during the mixing process, does this process violate either the first or the second law or both? explain and state all your assumptions.
Answers: 1
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
You know the right answer?
Suppose, that the EstimatedRTT is 90 at some point and the DevRTT is 25. After this point and on, al...
Questions
question
Mathematics, 21.05.2020 05:06
question
Mathematics, 21.05.2020 05:06
Questions on the website: 13722363