Vehicle counts were made on one direction of a 2-lane roadway three different times last Thursday. The person who made the counts produced the data that appear in the table below for your analysis. Convert the counts in the table into flow rates and average headways for each of the three time periods.

Count ID Start time End time Number of vehicles Flow rate Average time headway
H:M:S H:M:S vph
A. 7:00:00 7:45:00 511
B. 17:06:45 17:33:00 481
C. 14:16:45 14:16:45 249

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 19:20
Determine the stoichiometric and actual air-fuel ratios and the mole flue gas composition for combustion with 15% excess air for raw indiana, pennsylvania raw coal.
Answers: 3
question
Engineering, 06.07.2019 03:10
List and describe in sequence the operation process steps for boxf machine?
Answers: 1
You know the right answer?
Vehicle counts were made on one direction of a 2-lane roadway three different times last Thursday. T...
Questions
question
Mathematics, 16.12.2019 18:31
question
History, 16.12.2019 18:31
question
Mathematics, 16.12.2019 18:31
Questions on the website: 13722359