subject
Engineering, 11.03.2020 02:22 ayoismeisalex

Finished crankshafts take a lot of time and money to make, and are critical to the proper function of an automobile engine. Because of the critical nature of this part, one company measures several critical dimensions on each and every finished crankshaft. If any of the dimensions measured do not meet the engineering specifications, the crankshaft is scrapped Since measurements are being taken for inspection purposes, data is readily available for control charts as well. Dimension #11 is one of the many critical dimensions that is measured, and has been the subject of much debate. Lately, all of the crankshafts that are scrapped were scrapped because of dimension #11 being out of spec. The control charts for this dimension have been in statistical control, with a centerline on the X-bar chart of 547.9, and a centerline on the R-chart of 10.23. (Subgroups were formed by taking the first 5 crankshafts inspected each hour to form subgroups of n-6). Specifications for dimension #11 are 550.0 ± 10.0 (Assume a normal distribution of all characteristics measured when working this problem.) a) Using the above information, estimate the percentage of crankshafts that would not meet the specs for dimension #11 . Calculate Z-scores, and use the "Z-table" to find your answer.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
You know the right answer?
Finished crankshafts take a lot of time and money to make, and are critical to the proper function o...
Questions
question
Mathematics, 25.01.2022 04:10
question
Mathematics, 25.01.2022 04:10
question
Mathematics, 25.01.2022 04:10
question
English, 25.01.2022 04:10
Questions on the website: 13722367