subject
Engineering, 11.03.2020 05:37 browndariel

Consider two possible schemes for measuring angular velocity with an encoder. In Scheme A, a timer is set for a specified time interval TA, and the number of W/B transitions, MA, occurring in that interval are counted. In Scheme B, the time, TB, required for a fixed number MB of W/B transitions is measured.
Which of the following statements is true?

a. In scheme A, time interval TA is not the exact time that has elapsed for MA W/B transitions.
b. In scheme A, time interval TA is the exact time that has elapsed for MA W/B transitions.
c. Scheme A and scheme B, both have the same level of accuracy.
d. Scheme A is better than scheme B.
e. Scheme A is equivalent to scheme B.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
question
Engineering, 04.07.2019 19:10
What are the major differences between injection molding and extrusion?
Answers: 2
You know the right answer?
Consider two possible schemes for measuring angular velocity with an encoder. In Scheme A, a timer i...
Questions
question
Geography, 21.06.2019 14:30
question
Mathematics, 21.06.2019 14:30
Questions on the website: 13722363