subject
Engineering, 21.03.2020 04:25 Kingmoney959

Using the degree day method calculate the annual kwh use in springfield illinois with a heat loss of 12kw and an indoor design temperature of 70 f and assuming 24 hour per day accupancy

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 05.07.2019 23:20
Which one of the following faults cause the coffee in a brewer to keep boiling after the brewing cycle is finished? a. an open circuit in the heating element b. a short circuit at the terminals c. welded contacts on the thermostat d. a leak around the gasket
Answers: 3
You know the right answer?
Using the degree day method calculate the annual kwh use in springfield illinois with a heat loss of...
Questions
question
Chemistry, 30.08.2020 14:01
question
Geography, 30.08.2020 14:01
question
Mathematics, 30.08.2020 14:01
question
Physics, 30.08.2020 14:01
question
English, 30.08.2020 14:01
question
History, 30.08.2020 14:01
Questions on the website: 13722367