subject
Engineering, 31.03.2020 00:25 ddmoorehouseov75lc

A tension member is made of AISI 1045 steel heat treated to a hardness of HB=400. It has a width of b=120mm and a thickness of t=12mm, and there is an edge crack through the full thickness and extending to a length of a=18mm in the width direction. What is the maximum permissible tension load if a safety factor of 3 against brittle fracture is required? (You may use to simplify the calculation.) (20points)

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:20
A2-m rigid tank initially contains saturated water vapor at 100 kpa. the tank is connected to a supply line through a valve. steam is flowing in the supply line at 600 kpa and 300 c. the valve is opened, and steam is allowed to enter the tank until the pressure in the tank reaches the line pressure, at which point the valve is closed. a thermometer placed in the tank indicates that the temperature at the final state is 200°c. determine (a) the mass of steam that has entered the tank (b) the amount of heat transfer.
Answers: 3
question
Engineering, 04.07.2019 19:10
Apressure vessel with an r/t 20 cannot be treated as thin walled vessel. a)-trune b)- false
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
A tension member is made of AISI 1045 steel heat treated to a hardness of HB=400. It has a width of...
Questions
question
Mathematics, 06.06.2021 05:20
question
Chemistry, 06.06.2021 05:20
question
English, 06.06.2021 05:20
question
Mathematics, 06.06.2021 05:20
question
Mathematics, 06.06.2021 05:20
question
English, 06.06.2021 05:20
question
Mathematics, 06.06.2021 05:20
Questions on the website: 13722360