The heat required to raise the temperature of m (kg) of a liquid from T1 to T2 at constant pressure is Z T2CpT dT (1) In high school and in first-year college physics courses, the formula is usually given asQ ΔH m Q mCp ΔT mCpT2 ␣T1 (2)T1(a) What assumption about Cp is required to go from Equation 1 to Equation 2? (b) The heat capacity (Cp) of liquid n-hexane is measured in a bomb calorimeter. A small reaction flask (the bomb) is placed in a well-insulated vessel containing 2.00L of liquid n–C6H14 at T 300 K. A combustion reaction known to release 16.73 kJ of heat takes place in the bomb, and the subsequent temperature rise of the system contents is measured and found to be 3.10 K. In a separate experiment, it is found that 6.14kJ of heat is required to raise the temperature of everything in the system except the hexane by 3.10 K. Use these data to estimate Cp[kJ/(mol K)] for liquid n-hexane at T 300 K, assuming that the condition required for the validity ofEquation 2 is satisfied. Compare your result with a tabulated value.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
question
Engineering, 04.07.2019 19:10
Estimate the change in specific internal energy au and specific enthalpy h from inlet to outlet for ethylene glycol (a liquid) flowing through each of the following devices: (a) a heat exchanger where the glycol temperature increases from 20 °c to 80 °c; (b) a pump operating at about 25 °c and increasing the glycol pressure from 100 kpa to 8 mpa.
Answers: 2
question
Engineering, 04.07.2019 19:20
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
question
Engineering, 04.07.2019 19:20
A21-tooth spur pinion mates with a 28-tooth gear. the diametral pitch is 3 teeth/in and the pressure angle is 20°, find the following values: the addendum, dedendum, circular pitch, tooth thickness, and base circle diameters.
Answers: 2
You know the right answer?
The heat required to raise the temperature of m (kg) of a liquid from T1 to T2 at constant pressure...
Questions
question
Mathematics, 27.05.2021 16:10
question
Mathematics, 27.05.2021 16:10
question
Mathematics, 27.05.2021 16:10
question
English, 27.05.2021 16:10
question
English, 27.05.2021 16:10
Questions on the website: 13722363