Engineering, 07.04.2020 20:11 angellong94

The following systems of periodic tasks are scheduled rate-monotonically on one processor. Determine whether each system is schedulable using a method that is fast and/or uses the least amount of information on the tasks. (a) T_1 = (2, 0.5, 4), T_2 = (3, 1.0, 10), T_1 = (5, 1.0, 10), and T_1 = (7, 0.45, 15).

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
You know the right answer?
The following systems of periodic tasks are scheduled rate-monotonically on one processor. Determine...
Questions
question
Social Studies, 30.07.2019 17:00
Questions on the website: 13722360