Engineering, 07.04.2020 23:26 nickocasamplonp6mlob

A grader will be used to maintain 3 mils of haul road. It is estimated the work will require removing ruts with two passes in first gear, leveling the road with two passes in second gear, and final shaping of the road with three passes in fourth gear. Use an efficiency factor of 60%. Grader speeds are provided in the chart. Estimate the time requirement for this task.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:20
A2-m rigid tank initially contains saturated water vapor at 100 kpa. the tank is connected to a supply line through a valve. steam is flowing in the supply line at 600 kpa and 300 c. the valve is opened, and steam is allowed to enter the tank until the pressure in the tank reaches the line pressure, at which point the valve is closed. a thermometer placed in the tank indicates that the temperature at the final state is 200°c. determine (a) the mass of steam that has entered the tank (b) the amount of heat transfer.
Answers: 3
question
Engineering, 04.07.2019 19:10
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
You know the right answer?
A grader will be used to maintain 3 mils of haul road. It is estimated the work will require removin...
Questions
question
Mathematics, 04.03.2020 00:29
question
Mathematics, 04.03.2020 00:29
Questions on the website: 13722362