subject
Engineering, 14.04.2020 21:24 edog32

An engineering firm has been contracted for the design of a parabolic trough solar thermal power plant. If you were hired as the thermal design engineer, please perform analysis and find what is the maximum possible working fluid exit temperature? The optimal pipe length is equal to that when the oil exit temperature reaches 95% of the maximum possible temperature. What is the optimal pipe length? Please explain why the temperature of the oil would not increase after the maximum temperature is reached?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 03.07.2019 15:10
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
You know the right answer?
An engineering firm has been contracted for the design of a parabolic trough solar thermal power pla...
Questions
question
Mathematics, 30.05.2020 01:02
Questions on the website: 13722359