subject
Engineering, 14.04.2020 21:38 edamite12

Consider a group of 20 workers and a set of 40 tasks. Every worker can do 6 different tasks, and every task can be done by 3 different workers. Show that one can assign each task to a worker who can do it in such a way that every worker gets two tasks.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:20
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10ä1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
You know the right answer?
Consider a group of 20 workers and a set of 40 tasks. Every worker can do 6 different tasks, and eve...
Questions
question
Social Studies, 18.07.2019 18:00
question
Social Studies, 18.07.2019 18:00
question
Social Studies, 18.07.2019 18:00
Questions on the website: 13722362