subject
Engineering, 15.04.2020 20:47 godisgoodallthoubxi7

Although typically, electricity customers are charged based merely on the total number of kilowatt-hours they consume, some utilities have payment plans designed to encourage customers to shift their energy use to off-peak times. Suppose that a utility charges most customers a flat 7.9 cents/kWh under their standard plan, but under a special time-of-use plan, it charges 3 cents/kWh for off-peak times (between 10 p. m. and 11 a. m. on weekdays) and 16 cents/kWh at other times. If a customer always consumes electricity at the same rate, which plan should he or she sign up for? (Text Problem Number 12)

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Although typically, electricity customers are charged based merely on the total number of kilowatt-h...
Questions
question
Social Studies, 06.10.2019 18:00
Questions on the website: 13722359