Engineering, 21.04.2020 20:19 josh3419
Superheated steam at 20 MPa, 560°C enters the turbine of a vapor power plant. The pressure at the exit of the turbine is 0.5 bar, and liquid leaves the condenser at 0.4 bar at 75°C. The pressure is increased to 20.1 MPa across the pump. The turbine and pump have isentropic efficiencies of 95 and 85%, respectively. Cooling water enters the condenser at 20°C with a mass flow rate of 70.7 kg/s and exits the condenser at 38°C. For the cycle, determine: (a) the mass flow rate of steam, in kg/s. (b) the percent thermal efficiency.
Answers: 3
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
Engineering, 04.07.2019 18:20
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
Superheated steam at 20 MPa, 560°C enters the turbine of a vapor power plant. The pressure at the ex...
Mathematics, 13.09.2020 22:01
Mathematics, 13.09.2020 22:01
Biology, 13.09.2020 22:01
Mathematics, 13.09.2020 22:01
English, 13.09.2020 22:01
Mathematics, 13.09.2020 22:01
Chemistry, 13.09.2020 22:01
Social Studies, 13.09.2020 22:01
Mathematics, 13.09.2020 22:01
Health, 13.09.2020 22:01
Mathematics, 13.09.2020 22:01
Social Studies, 13.09.2020 22:01
Mathematics, 13.09.2020 22:01
Physics, 13.09.2020 22:01
Mathematics, 13.09.2020 22:01
Mathematics, 13.09.2020 22:01
Mathematics, 13.09.2020 22:01
Mathematics, 13.09.2020 22:01
Mathematics, 13.09.2020 22:01
Geography, 13.09.2020 22:01