subject
Engineering, 21.04.2020 22:50 evandlubbep6bsvu

There are two machines for sale that you are considering purchasing for your sawmill to produce hardwood flooring. You want to find the one that has a higher process capability index, or Cpk. The goal is to produce flooring that is between 46 and 50 millimeters thick. The first machine is more accurate on average, producing to a mean of 48 millimeters…but unfortunately it has more variation with a standard deviation of .7 millimeters. The second machine is not as accurate, with a mean of 47mm, but does deliver a more consistent output, with standard deviation of .3mm.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
question
Engineering, 04.07.2019 19:10
An electric kettle is made out of stainless steel, weighs two pounds (when empty) and is equipped with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling
Answers: 2
You know the right answer?
There are two machines for sale that you are considering purchasing for your sawmill to produce hard...
Questions
Questions on the website: 13722360