subject
Engineering, 22.04.2020 04:19 Conner4600

The end of a large tubular workpart is to be faced on a NC vertical boring mill. The part has an outside diameter of 38.0 in and inside diameter of 24.0 in. If the facing operation is performed at a rotational speed = 40 rev/min, feed = 0.015 in/rev, and depth = 0.180 in, determine: (a) the cutting time to complete the facing operation, (b) the cutting speeds and metal removal rates at the beginning and end of the cut.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
You know the right answer?
The end of a large tubular workpart is to be faced on a NC vertical boring mill. The part has an out...
Questions
question
English, 18.09.2019 20:30
question
English, 18.09.2019 20:30
question
History, 18.09.2019 20:30
question
Biology, 18.09.2019 20:30
Questions on the website: 13722361