subject
Engineering, 26.04.2020 13:48 putaprincess16

Food is dried in a co-current dryer from an inlet moisture content of 0.3 kg moisture per kg product to an outlet moisture content of 0.15 kg moisture per kg product. Air at dry bulb temperature 30oC and RH 40% is heated to the dryer inlet temperature 110oC. The dry bulb temperature of the exhaust air from the dryer should be at least 10oC above the dew point to prevent condensation in pipework. Calculate the exhaust air temperature and RH that meet this requirement and the mass of air required (kg/ h (dry basis) per kg/ h of dry solids).

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 04.07.2019 18:20
Water vapor initially at 10 bar and 400 °c is contained within a piston-cylinder assembly. the water lost heat to the surrounding according to isochoric (iso-volumetric) process until its temperature is 150 °c. the water is then condensed isothermally to saturated liquid. for the water as a system, calculate the work in kj/kg
Answers: 2
You know the right answer?
Food is dried in a co-current dryer from an inlet moisture content of 0.3 kg moisture per kg product...
Questions
question
Mathematics, 29.12.2021 16:30
question
Mathematics, 29.12.2021 16:30
question
Physics, 29.12.2021 16:30
question
English, 29.12.2021 16:30
question
Mathematics, 29.12.2021 16:30
Questions on the website: 13722360