Scaffolding is to be constructed on all faces of a six-story building in order for major masonry rehabilitation work to be performed. The exposed surface area of the exterior walls of the building has been estimated to be 432,000 sq. ft. Historical records of the company show that for this simple type of structure, the production rate for erecting scaffolding is 0.002 hours per square foot of building surface area. If 10 workers (working 8-hour days) are assigned to do the entire scaffolding erection, what duration (in working days) should be used for this activity? Round up your answer to the nearest whole integer day.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
For the closed feedwater heater below, feedwater enters state 3 at a pressure of 2000 psia and temperature of 420 °f at a rate of ix10 ibhr. the feedwat extracted steam enters state 1 at a pressure of 1000 psia and enthalpy of 1500 btu/lbm. the extracted er leaves at an enthalpy of 528.7 btu/lbm steam leaves as a saturated liquid. (16) a) determine the mass flow rate of the extraction steam used to heat the feedwater (10) b) determine the terminal temperature difference of the closed feedwater heater
Answers: 3
question
Engineering, 04.07.2019 18:10
The thermal expansion or contraction of a given metal is a function of the f a)-density b)-initial temperature c)- temperature difference d)- linear coefficient of thermal expansion e)- final temperature f)- original length
Answers: 2
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
You know the right answer?
Scaffolding is to be constructed on all faces of a six-story building in order for major masonry reh...
Questions
question
Mathematics, 16.11.2020 22:30
question
Health, 16.11.2020 22:30
question
Arts, 16.11.2020 22:30
question
Mathematics, 16.11.2020 22:30
question
Mathematics, 16.11.2020 22:30
question
History, 16.11.2020 22:30
Questions on the website: 13722359